Case study: an injection mould for Bidso in 7 days

Short answer: Bidso needed a launch part quickly, and other toolmakers had quoted 45 days. Our tool room cut the core and cavity and fitted them into a standard mould base in 7 days, less than half of our usual 15-day commitment, and the parts were moulded in our own plant.

Send your drawing for reviewBook a 15-minute call

VMC machining centre in GPI's tool room, Delhi, where Express Mould cores and cavities are cut
15 days
to a ready tool-steel mould
~50%
lower die cost
₹2,000/day
we pay if we are late
Since 1968
General Plastic Industries, Delhi

The brief

Bidso needed moulded parts for a product launch. In their words:

"Every toolmaker quoted us 45 days for our launch parts. GPI committed a date, sent WhatsApp photos as the mould came together, and delivered on time. For a new product, that is exactly what you need." (Bidso)

What we did

Instead of building a complete new mould, our tool room cut only the core and cavity in tool steel and fitted them into a standard mould base. The mould was ready in 7 days, less than half of our usual 15-day commitment. We then moulded the parts in our own plant.

The result

Lead time other toolmakers quoted 45 days
Express Mould: mould ready in 7 days
Steel Tool steel core and cavity
Updates during the build WhatsApp photos
Moulding In GPI's own plant

What this means for your launch

If your launch date is fixed and the tooling lead time is the bottleneck, a standard base with new inserts can take weeks off the plan. Our written commitment is 15 days from design approval, with ₹2,000 a day paid to you if we are late. Send your drawing and we will tell you whether your part fits, and the date.

Questions buyers ask

Can every mould be ready in 7 days?

No. Our commitment is 15 days from design approval, and if we are late we pay ₹2,000 a day. 7 days is our fastest so far. We tell you the date before you order.

Why is Express Mould faster than a conventional mould?

We do not build a whole new mould. The mould bases are already made, so our tool room only machines the core and cavity for your part in tool steel and fits them into a standard base.

How did the client know the work was on track?

We committed a date at the start and sent WhatsApp photos as the mould came together, so there were no surprises on delivery day.