expressmouldby General Plastic Industries General Plastic Industries (GPI) logo

Home / New product with many parts?

20–30 part product? Put 5–10 parts on Express Mould and cut your tooling capex

Short answer: In most new products, 5 to 10 of the 20–30 plastic parts are small or medium and can go on Express Mould at about half the usual die cost. Build full moulds only for the large or complex parts, and your upfront tooling capex comes down sharply, often by several lakh rupees, before you have sold a single unit.

Send your drawing for reviewBook a 15-minute call

Lamp lenses, gears, fan and housings: the many plastic parts of typical products moulded at GPI
15 days
to a ready tool-steel mould
~50%
lower die cost
₹2,000/day
we pay if we are late
Since 1968
General Plastic Industries, Delhi

Most product launches stall on the same line in the budget: tooling. A new appliance, toy or device can have 20–30 plastic parts, and a full mould for each one adds up quickly, all before the first unit sells.

It doesn't have to be all or nothing

Look at the parts list. A few parts are large or complex and need a full production mould. But most products also have many small and medium parts (clips, knobs, caps, covers, brackets) that fit a standard mould base.

Put those on Express Mould, and each of those moulds costs about half.

An illustrative example

24-part product Conventional With Express Mould
8 small and medium parts 8 × ₹2 lakh = ₹16 lakh 8 × ₹1 lakh = ₹8 lakh
16 larger or complex parts Full moulds Full moulds
Capex saved before launch ₹8 lakh

Actual savings depend on your parts. We will show you the numbers for yours.

Why it is safe

  • Same steel. Express Mould cores and cavities are P20 or H13 tool steel.
  • Same plant. All your parts, from both kinds of mould, are moulded by GPI in Delhi.
  • Same date discipline. Each Express Mould is ready in 15 days, or we pay ₹2,000 a day.
  • Room to grow. When a part's volume passes about 1 lakh a year, it moves to a full mould with the same team.

Talk to us before you order the tools

A 15-minute call is usually enough to tell which parts can go Express. Send the parts list or the assembly file, and we will mark it up for you.

Questions buyers ask

How do I know which of my parts can go on Express Mould?

Send the parts list or the assembly CAD. On a 15-minute call our tool room marks which parts fit a standard base and which need a full mould, with a rough capex comparison.

Can parts on Express Mould and full moulds be supplied together?

Yes. We build both kinds of mould and mould all the parts in the same plant, so you deal with one supplier and one schedule.

What if a part's volume grows later?

Then we move it to a dedicated base or build a full production mould, in the same plant with the same team. You never start over.