expressmouldby General Plastic Industries General Plastic Industries (GPI) logo

Home / Case study · Luggage

Case study: a ₹10 lakh luggage mould, built for ₹5 lakh

Short answer: Two brands, Madame and Chandu Kaka Saraf Jewellers, wanted their own hard-shell cabin trolley with a matching vanity case. A conventional mould would have cost about ₹10 lakh. With Express Mould, we cut the shell core and cavity in tool steel and fitted them into a standard base, for about ₹5 lakh, half the upfront capex.

Send your drawing for reviewBook a 15-minute call

Blue hard-shell cabin trolley and vanity case made with Express Mould for Chandu Kaka Saraf Jewellers Pink hard-shell cabin trolley and vanity case made with Express Mould for Madame
15 days
to a ready tool-steel mould
~50%
lower die cost
₹2,000/day
we pay if we are late
Since 1968
General Plastic Industries, Delhi

The brief

Two brands wanted to launch their own hard-shell luggage: a cabin trolley with a matching vanity case, in their own colours. Neither wanted to put ₹10 lakh into a mould before knowing how the product would sell.

What we did

Instead of building a complete new luggage mould, our tool room cut only the shell core and cavity in tool steel and fitted them into a standard base. The shells were trialled on a 500-ton machine and ran well. We then moulded the shells and assembled the luggage in our own plant.

The result

Conventional mould Express Mould
Mould cost About ₹10 lakh About ₹5 lakh
Upfront capex Full 50% less
Steel Tool steel Tool steel
Moulding and assembly Separate vendors One plant

Two brands launched: Madame in pink, and Chandu Kaka Saraf Jewellers in blue.

What this means for your product

If you have a product with many parts, or a large part you are not sure will sell, you do not have to put the full tooling cost upfront. In most new products, the small and medium parts, and often some larger ones, can go on Express Mould. Build full moulds only where the volume or complexity really needs them.

Also: a mould in 7 days for Bidso

When Bidso needed a launch part quickly, our tool room built the mould in 7 days, less than half of our usual 15-day commitment.

Questions buyers ask

Can large parts like luggage shells be made with Express Mould?

Yes, within the size our bases take. The luggage shells were trialled on a 500-ton machine and ran well. Send the drawing and our tool room will confirm the fit for your part.

Does a cheaper mould mean a lower-quality shell?

No. The core and cavity were cut in tool steel and the shells moulded on our own machines, with the same finish a conventional tool would give.

Who assembled the luggage?

We moulded and assembled the luggage in our own plant. GPI's group also runs a dedicated hard-luggage manufacturing unit.