expressmouldby General Plastic Industries General Plastic Industries (GPI) logo

Home / 200 – 1,00,000 parts a year

Low-volume injection moulding in India, from 200 to 1 lakh parts a year

Short answer: For 200 to about 1 lakh parts a year, a full production mould is usually more tool than you need, and 3D printing or vacuum casting costs too much per piece. Express Mould fills that gap: tool-steel core and cavity in a standard base, mould ready in 15 days at about half the die cost, and production-quality parts at production prices.

Send your drawing for reviewBook a 15-minute call

Line of injection moulding machines at General Plastic Industries in Delhi
15 days
to a ready tool-steel mould
~50%
lower die cost
₹2,000/day
we pay if we are late
Since 1968
General Plastic Industries, Delhi

Low-volume production has always been awkward. Printed or cast parts look right but cost too much per piece and are not your real material. A full production mould gives perfect parts, but you pay for a whole tool and wait 45 days or more.

Which route suits which quantity?

Parts a year Best route Why
1–10 3D printing No tooling. Good for look-and-feel samples.
10–200 3D printing or vacuum casting Low tooling cost, but high cost per piece.
200 – 1,00,000 Express Mould Real moulded parts in your plastic, about half the die cost, 15 days.
1,00,000+ Production mould Multi-cavity tooling, lowest cost per piece.

Why does Express Mould work at low volume?

Every mould has two parts: a heavy steel base, and the core and cavity that give the part its shape. The base is most of the steel and much of the cost, yet it is the same from one part to the next. We keep standard bases built and waiting, and for your part we make only the core and cavity, in tool steel.

So you get a real injection mould and production-quality parts without paying for a whole tool.

What does it cost, and how do you pay?

  • About half the usual die cost for the mould.
  • Per-piece price like normal production. Mould maintenance is included in the piece price.
  • Payment: 50% advance, 30% at the first trial (T0) and 20% on sample approval. GST extra.
  • Samples and trial material are included. Transport is extra.

Is the delivery date guaranteed?

Your 15 days start when you approve the mould design. If we deliver late, we pay you ₹2,000 for every day, up to 50% of the mould cost, adjusted against your invoice.

Questions buyers ask

What is the minimum quantity?

There is no hard minimum, but under about 200 pieces a mould rarely pays for itself. For 1–10 pieces we suggest 3D printing, and for a few dozen, vacuum casting.

How many parts can I get per month?

An Express Mould runs on a shared base, so it gets about 4–5 production days a month, roughly 4,000–5,000 pieces per mould. If you need more, your inserts can move to a dedicated base with no monthly limit.

What happens when my volume grows past 1 lakh a year?

Then a full production mould, often multi-cavity, is cheaper per piece. We build those too, in the same plant with the same team. Many of our Express Mould clients have moved up this way.

Is the part quality lower than a normal mould?

No. The core and cavity are cut in the same P20 or H13 tool steel as a production mould, and the parts are moulded on the same machines. Only the mould base is shared.