expressmouldby General Plastic Industries General Plastic Industries (GPI) logo

Home / Rapid tooling · Bridge tooling

Rapid tooling and bridge moulds in India, in tool steel

Short answer: Rapid tooling usually means a soft aluminium mould that wears out after a few thousand shots. Express Mould is rapid tooling in tool steel: the core and cavity are cut in P20 or H13 and fitted into a standard base, so the mould is ready in 15 days and lasts about 2–3 lakh shots, enough to bridge to production and often to run it.

Send your drawing for reviewBook a 15-minute call

Core and cavity inserts being machined in GPI's tool room for an Express Mould
15 days
to a ready tool-steel mould
~50%
lower die cost
₹2,000/day
we pay if we are late
Since 1968
General Plastic Industries, Delhi

Rapid tooling exists because full moulds take too long. The usual answer is aluminium: fast to cut, but soft, so it wears out quickly and the parts may not match what a production mould will give you.

Can you get tool steel at rapid-tooling speed?

Express Mould takes a different route. Instead of building a whole mould in a soft metal, we build only the part-shaping steel, the core and cavity, and fit it into a standard tool-steel base that is already built.

Aluminium rapid tool Express Mould Production mould
Core and cavity Aluminium P20 / H13 tool steel Tool steel
Mould ready 2–4 weeks 15 days 45+ days
Typical life A few thousand shots 2–3 lakh shots Lakhs of shots
Mould cost Low About half a full mould Full mould
Parts Close to final Production quality Production quality

Does a bridge mould have to be replaced later?

A bridge mould carries you from prototype to production while the production tool is being made. With Express Mould, the bridge is often good enough to stay: at 200 to 1 lakh pieces a year, many parts never need a full mould at all. When volumes grow, the same team builds your production mould in the same plant.

Which parts fit?

Parts from about 2 mm to over 150 mm, in PP, ABS, PC, PMMA, nylon, POM and other common plastics, with undercuts, sliders and metal inserts where needed. About 8 in 10 parts fit. Very complex parts with many sliders, or parts too big for our bases, need a full mould, and we will say so up front.

Is the speed guaranteed?

Your 15 days start when you approve the mould design. Late? We pay ₹2,000 a day, adjusted against your invoice.

Questions buyers ask

Is Express Mould an aluminium prototype mould?

No. The core and cavity are P20 or H13 tool steel, the same steels used in production moulds. Only the base is standard and shared.

How is it faster than a normal mould?

The base, which is most of the steel and work in a mould, is already built. We design and machine only your core and cavity, and 13 months of R&D in our tool room went into making that swap fast and accurate.

Can it be faster than 15 days?

In specific cases, yes, 7 to 10 days, at an extra cost. We built a mould for Bidso in 7 days.

Who owns the tooling?

The core and cavity belong to you. The Express Mould runs in our plant. If you choose to take the tooling, you take the core and cavity only, at about 30% extra cost.