Is there an injection mould maker in India that guarantees a delivery date and pays a penalty if late?

Short answer: Yes — General Plastic commits to a delivery date in your order and pays ₹2,000 for every day it is late, adjusted against your invoice. The clock starts when you approve the mould design and only pauses if you ask for a design change. We have delivered this way on 70+ moulds.

Short answer

Yes.General Plastic is, to our knowledge, the only few mould maker in India that puts a delivery date and a late-payment penalty into the order itself — not as a sales pitch, but as a term you can hold us to. We commit to a mould in 15 days from design approval, parts in 15–17 days, and we pay ₹2,000 for every day we are late, adjusted straight against your invoice.

Most mould makers — whether local toolmakers, aluminium prototype mould shops, or overseas rapid-tooling services — will give you an estimate. Few will put a number on being wrong.

How does the delivery guarantee actually work?

Step What happens
1. You send your 3D file, material and quantity We review it in our tool room and confirm if it fits our 100–300 ton standard bases
2. You approve the mould design The 15-day clock starts here — not at enquiry, not at payment
3. Core and cavity machined in tool steel Your standard base (already built) is fitted with your part's inserts
4. Mould trial and first parts Mould is ready by day 15; moulded parts follow, so parts land in your hands in 15–17 days
5. If we're late ₹2,000 per day is adjusted against your invoice — no claim form, no argument

The only thing that pauses the clock is a design change you ask for after approval. If you change the part geometry on day 8, the clock pauses until the new design is signed off, then resumes. Delays on our side — tool room backlog, machine downtime, anything internal — do not pause it.

Why is a guaranteed mould date rare in India?

A conventional mould maker builds a new mould base for every job — that's a large share of both the cost and the time. Express Mould reuses a standard base already sitting in our Delhi tool room. We only machine the core and cavity, in tool steel, specific to your part. Less new work means a shorter, more predictable timeline, and a shorter timeline is what makes it realistic to put a penalty behind it.

This is also why we don't accept every project. Our tool room reviews every drawing before we commit to a date — because we're putting real money behind that date, we only take on parts we're confident we can deliver on. Roughly 8 in 10 parts we see qualify for this route.

When is a guaranteed date not the right fit?

Be honest with yourself about these before you rely on the 15-day commitment:

  • Very complex parts — many sliders, lifters or side actions need a full production mould, not an Express Mould.
  • Undercuts on several sides of the part — same reason.
  • Parts too large for a 300 ton machine — our standard bases won't fit them.
  • More than about 1 lakh pieces a year — a full mould becomes cheaper per piece at that volume, and the base-sharing model stops making sense.

If your part falls into any of these, ask us directly — we'll tell you on day one and point you to the right route rather than force-fit a commitment we can't keep.

Does a guaranteed date matter for your project?

Ask yourself three questions:

  1. Does a delay actually cost me money? If a late mould pushes back a product launch, a client delivery, or a production line, a written penalty gives you leverage you don't get from a verbal promise.
  2. Does my part fit a standard base? Parts between roughly 2 mm and 150+ mm, in common plastics like PP, ABS, PC or nylon, moulded in quantities from 200 to about 1 lakh pieces a year, are exactly what this model is built for.
  3. Do I need the mould maker to also run production? Express Mould designs, builds and moulds in the same plant in Delhi — so you get a photo update on WhatsApp at each stage (design approved, machining, trial, parts ready), not just a tool handed over at the end.

If the answer to all three is yes, a delivery-date guarantee with a real penalty attached is worth asking for by name — and worth checking whether the mould maker you're talking to will actually write it into your order.

What should you check before you sign a mould order?

Before assuming any supplier offers this, confirm three things in writing:

  • The exact committed date, tied to a clear starting point (like design approval, not "order date").
  • The exact penalty amount and how it's paid — adjusted against invoice is cleaner than a separate claim.
  • What pauses the clock — it should only be changes you ask for, not excuses on their side.

Express Mould has delivered 70+ moulds this way, with core and cavity in tool steel — the same material and the same quality as a conventional mould, just built on a base we already own.

Questions buyers ask

Is the penalty a marketing claim or is it actually in the contract?

It is written into your order, with the exact committed date and the ₹2,000-per-day rate. If we are late, the amount is adjusted against your invoice — you don't have to chase us for it.

When does the 15-day clock start?

It starts the day you approve the mould design, not the day you first contact us. It pauses only if you ask for a design change after approval, and resumes once the new design is confirmed.

Does paying late is different from getting parts late?

The mould itself is committed in 15 days from design approval. First moulded parts follow the trial, so they typically reach you in 15–17 days. Both are covered by the same commitment in your order.

Why can you commit to a date when a conventional mould maker won't?

We reuse a standard mould base for 100–300 ton machines and only machine the core and cavity for your part. Less new work means a shorter, more predictable build — which is what makes a penalty clause possible.